Refit Project Manager

Run multi-contractor yacht refit projects on scope, schedule and budget — with documentation that survives the yard period.

Line-item
Scope items
vs actual cost
Project budget
30-80
Contractors
Versioned
Vessel documents
Yacht refit project manager in hi-vis vest holding a tablet with project schedule in front of a 45-metre yacht in dry dock with scaffolding

A refit project manager owns the scope, schedule, budget, contractor coordination, and documentation of a yacht refit — typically a 3-9 month yard period with 30-80 specialist contractors and an immovable launch deadline.

Scope is the constitution

A refit lives or dies by line-itemised scope. Every item priced, every item categorised, every item assigned. Vague scope generates variation orders that destroy budget.

  • Categorisation (paint, mechanical, electrical, interior, etc.)
  • Owner-approved vs to-be-approved
  • Long-lead items flagged early
  • Owner-supplied vs yard-supplied items

Three budget views

A refit needs three views of budget at all times: committed (signed), forecast (anticipated), actual (spent). Each tells a different story.

  • Committed: signed POs + contracts
  • Forecast: anticipated based on scope progress
  • Actual: invoices received + paid

The 2026 reality, by the numbers

30-80
Specialist contractors per refit
3-9 months
Typical yard period duration
€500k-30M
Refit budget range
5-50
Variation orders per project

Variation orders are how budgets escape

A refit goes through 5-50 variation orders. Each one is a deviation from scope, priced, owner-approved, dated.

  • Origin: owner request vs surveyor discovery vs yard finding
  • Owner approval workflow with audit trail
  • Schedule impact assessment
  • Cumulative variation budget tracking

What separates the calm refit PMs

High-performing refit PMs share a pattern: one platform holds scope, budget, extra works, suppliers and vessel documents. Fewer surprises reach the launch because the data did not drift. See the Shipyard module for the full operational scope.

Typically found inside

Yacht Refit YardsYacht Management Companies (PM on outside yard)Independent Refit Project ManagersOwner-Direct Refit ProgramsBuilder-Affiliated Refit Operations
Mediterranean shipyard with three yachts in different refit stages and scaffolding
A 6-month yard period with 30-80 contractors is a small construction project. The platform that holds the scope holds the project.
Daily reality

What this role faces every week

Recurring pain points across refit project managers — most reducible by tighter scope and budget tooling.

Vague scope at the start

Vague scope generates uncontrolled variations in week 4. The PM is then negotiating with the owner instead of executing.

Line-itemised scope upfront is the highest-ROI investment a PM makes.

Budget drift without visibility

Committed, forecast, actual — only one of these is usually tracked in real time. The other two surface at month-end.

Variation order chaos

5-50 variations per project, each with origin, pricing, owner approval, schedule impact, cumulative drift.

Contractor coordination overhead

30-80 specialists: painters, electricians, plumbers, AV installers, hydraulic technicians, naval architects. WhatsApp + email is not a system.

Schedule slippage

An immovable launch date + bad weather + late long-lead items + variation orders. Schedule slip is the default without active management.

Class society documentation

Refit ends with class society approval for relaunch. Without continuous documentation, the audit is a panic.

What SupaSailing does

Built around this exact workflow

SupaSailing Shipyard gives the refit PM projects and work orders, budget against actual cost, quotes for extra works, the planner, supplier orders and vessel documents in one place.

Scope in quotes and work orders

Quotes with chapters and priced lines, linked to the work orders that carry tasks, assignees and checklists.

Budget vs actual per project

Budget, actual cost and progress on every project, with delayed and over-budget status. Work orders compare logged hours × yard rate with the estimate.

Extra works as quotes

Each extra is a separate quote marked approved or rejected, linked to the vessel and work order, visible to the owner in the Owner Portal.

Subcontractors and suppliers

Purchase orders against the project, goods receipt, and expiring upload links for subcontractor certificates and reports.

Planner with vessel Gantt

Drag-and-drop planner with vessel Gantt, week grid, day view and kanban, overbooking warnings and absences that block the plan.

Vessel documents and dossiers

Documents with versions, expiry dates and approvals, plus required-document dossiers that show what is still missing.

Photo progress on work orders

Photo galleries on work orders and projects; the yard team can report a defect with a photo from the Telegram bot.

Handover into the Vessel Passport

Components, documents and work history stay in the Vessel Passport, with a handover pack and a passport PDF.

Refit project documentation on a folding table at the yard with tablet showing budget tracking
Refit data has a second life — feeding back into operations after the yacht relaunches. The platform that captures it well at the yard pays dividends afterwards.
How it works in practice

A typical workflow with SupaSailing

A representative yard period for a refit PM on SupaSailing — 7 representative phases.

  1. 1

    Pre-yard — Scope definition

    Owner + captain + surveyor inputs. Line-itemised scope priced in a quote and approved.

  2. 2

    Week 1 — Haul-out

    Initial condition survey with findings pinned on drawings; scope refined after hull/keel/prop discovery. First extra-works quotes go to the owner.

  3. 3

    Month 1 — Major works begin

    Painters, electricians, AV installers scheduled on the planner through their work orders; hours logged against each one.

  4. 4

    Month 2-3 — Mid-project review

    Owner review with budget vs actual, approved extras and work order photos on the table.

  5. 5

    Month 4 — Long-lead delivery

    Long-lead items (engines, generators, AV) on purchase orders against the project, booked in with goods receipt.

  6. 6

    Month 5 — Sea trial preparation

    Certificates and reports reviewed. Dossier completeness visible, expiring documents flagged.

  7. 7

    Launch + handover

    Components, documents and work history stay in the Vessel Passport. The owner gets the handover pack and Owner Portal access.

Operational impact

Where the difference shows up

What changes when a refit PM moves from MS Project, email and paper files to one shipyard platform.

One planner

Schedule

Work orders, people and absences on one plan, with overbooking warnings.

Budget vs actual

Budget tracking

Each project shows its budget against actual cost and a status.

Quoted first

Extra works

Extras go out as quotes, approved or rejected before they are invoiced.

In one place

Documents before handover

Versions and expiry dates live with the vessel, not in email threads.

Before / after

Manual workflow vs SupaSailing

Aspect
Manual workflow
With SupaSailing
Scope
Word doc + Excel line items
Quote chapters + work orders with status
Budget views
Actual only, mid-month gap
Project budget vs actual cost
Variation orders
Email chain + paper signature
Extra-works quotes, approved or rejected
Contractor coordination
WhatsApp groups
Work orders, purchase orders, upload links
Schedule
MS Project export
Vessel Gantt + drag-and-drop planner
Documentation
2 weeks of gathering before audit
Versioned documents with expiry dates
Post-refit data
Lost when yard period ends
Stays in the Vessel Passport